Air Conditioning and Refrigeration Job Safety Analysis (JSA)


People often ask, "Can I have a Job Safety Analysis (JSA) for Air Conditioning and Refrigeration?" "A document that covers everything?"  The answer is not really. 

A Job Safety Analysis (JSA) needs to document step by step how you are going to do a particular job. Not all jobs are the same! Are you going to install a refrigeration unit to a coolroom or a split system to a house?

The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential hazards and the hazard control measures are very different as well.

The JSEAsy software builds your site specific SWMS for your cleaning job by adding templates of the steps you are going to take, in the order in which you are going to take them.

The JSEAsy software comes preloaded with hundreds of templates (job steps).

Below is an example of templates you may insert into your site specific JSA for Installation of ducted system air conditioner
  1. Site Orientation/ Induction
  2. Access ceiling space via Ladder
  3. Install new ceiling mounted unit
  4. Run Cables through existing ceiling space
  5. Run Pipe work  through existing ceiling space
  6. Cut copper pipe with tube cutter
  7. Welding copper tube
  8. Cut plasterboard using a key hole plasterboard saw
  9. Install ceiling registers
  10. Install flexi ductwork and zone motors in ceiling space
  11. Connect new cables into electrical plant/ equipment
  12. Connect new cables into existing switchboard
  13. Refrigerant charge the system using a vacuum pump
  14. connect pressure pump
  15. Test the electrical installation
  16. Fill out and issue Electrical Certificate of Compliance
  17. Cleaning up work area
  18. Vacuum

When you insert a template it automatically brings with it:

  1. The main process step
  2. The sub process steps associated in undertaking the task
    1. The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
    2. The Risk Rating for undertaking the task (You can also change this if you want to)
    3. The Hazard Control measure (you can also delete or add any of these with a simple click)
    4. The revised risk rating after applying the control (You can also change this if you want to)
    5. Any required PPE (you can also delete or add any of these with a simple click)
    6. Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
    7. Any pre operational inspections required (you can also delete or add any of these with a simple click)
    8. Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
Hundreds of templates included - 1 low price - Exceptional value!

When you buy or rent the JSEAsy software, not only to get all of the templates specifically for plumbing but you also get all of the templates for all of the other trades as well. Air Conditioning and Refrigeration don't just do air conditioning and refrigeration! You will also benefit from many of the electrical and mechanical templates there are multiple templates under Roof Plumbing that will be of use. You may benefit from many other industry and trade templates if you are doing a refit such as: Ceilings and Wall Linings, Painting, Roof Plumbing.

There is an example of a JSA generated from the system available for download. 

The Main points in this example JSA are templates that have been inserted into the “Site Specific JSA” to build it.  

 See JSEAsy features and demonstrations for  video demonstrations on how this works (They run for around 4 minutes each)


 Process: Click the Links below to learn more about JSEAsy Software and the process. Opens in a NEW TAB / WINDOW)

 

View an InfoGraphic about How JSEAsy Software works    

    

View a JSEAsy System Flowchart    

 

When you buy or Rent JSEAsy v4.2 you have access to all of the JSA templates, for all trades and industries.
 
Air Conditioning and Refrigeration JSA Templates Pre-Loaded and ready for use are shown below:


 

 No.

 Description

 Cost

1
Acceptance of delivery to site for materials
Included
2
Acceptance of delivery to site for materials via Crane Truck
Included
3
Access ceiling space via Ladder
Included
4
Access roof via fixed access ladder
Included
5
Access roof via Ladder
Included
6
Access Roof via scaffold stair access
Included
7
Access roof via Scissor Lift
Included
8
Access work area Using a platform ladder
Included
9
Access Work area via scaffold
Included
10
Apply touch up paint
Included
11
Claim Work Area
Included
12
Cleaning up work area
Included
13
Connect hose to existing water supply tap
Included
14
Connect new cables into electrical plant/ equipment
Included
15
Connect new cables into existing switchboard
Included
16
Core hole through masonry wall with a battery powered rotary hammer drill
Included
17
Cut aluminium angles using a hacksaw and mitre box
Included
18
Cut copper pipe with tube cutter
Included
19
Cut materials using an electric mitre saw
Included
20
Cut Steel/ Unistrut with dropsaw
Included
21
Cutting Bitumen with a Quick Cut Diamond blade saw
Included
22
Cutting Concrete with a Quick Cut Diamond blade saw
Included
23
Cutting Steel using an Angle Grinder
Included
24
Disconnect electrical from existing plant
Included
25
Disconnect pipework form existing plant
Included
26
Drill hole into masonry surface with a battery powered rotary hammer drill
Included
27
Drill hole using a Battery Powered Drill
Included
28
Drill hole using an electric drill
Included
29
Erection and use of mobile scaffold
Included
30
Fill out and issue Electrical Certificate of Compliance
Included
31
Filling & testing of pipework
Included
32
Fit Pipe insulation over pipes
Included
33
Fit switch to plasterboard wall
Included
34
Fit Unistrut brackets onto masonry wall
Included
35
Fix aluminium channels to existing slab
Included
36
Form and Flash Roof Penetrations
Included
37
Hang condensing unit onto masonry wall
Included
38
Hang Fan cooler unit inside cool room
Included
39
Inform facilities / operations and security personnel of work location(s)
Included
40
Inspect and drive passenger/ light commercial vehicle
Included
41
Inspection and use of Generator
Included
42
Inspection and use of petrol powered high pressure water sprayer
Included
43
Install ceiling registers
Included
44
Install flexi ductwork and zone motors in ceiling space
Included
45
Install insulated ceiling panels to cool room
Included
46
Install new wall mounted unit
Included
47
Install screws using a Battery Powered Drill
Included
48
Install screws using a tek gun
Included
49
Install TX Valve
Included
50
Installation of catenary cable
Included
51
Installation of Cool Room
Included
52
Installation of ducted system air conditioner
Included
53
Installation of refrigeration system to cool room
Included
54
Installation of support angles or channels to hanging rods
Included
55
Installation of threaded rod hanging bars
Included
56
Installation of wall hung split system air conditioner
Included
57
Isolate power to existing system
Included
58
Loading Materials onto roof using an EWP
Included
59
Loading materials onto truck using a crane and by hand
Included
60
Marking Out Slab or Ground
Included
61
Monitoring and Review of SWMS
Included
62
Mount condensing unit onto preinstalled Unistrut brackets
Included
63
Move materials using a trolley (sack Truck)
Included
64
Moving materials around on a trolley
Included
65
Pressure testing of pipework with nitrogen and charge with refrigerant (HCFC)
Included
66
Push Wheel Barrow on site
Included
67
Reclaim refrigerant gas from existing system
Included
68
Refrigerant charge the system using a vacuum pump
Included
69
Refuelling of machinery
Included
70
Remove existing wall mounted unit
Included
71
Repeat the above process steps until completion of task
Included
72
Replacement of ducted system air conditioner
Included
73
Replacement of wall hung split system air conditioner
Included
74
Run Cables and secure to catenary cable
Included
75
Run Cables through existing ceiling space
Included
76
Run connecting copper pipework and fit off
Included
77
Run Pipe work through existing ceiling space
Included
78
Safety Check And Use Of Boom Lift
Included
79
Safety Check And Use Of Scissor Lift
Included
80
Safety inspection and use of Forklift
Included
81
Secure conduits to structure with saddles
Included
82
Secure pipework to structure with saddles
Included
83
Silver solder copper pipes together
Included
84
Site Establishment
Included
85
Site orientation of domestic residence
Included
86
Site Orientation/ Induction
Included
87
Stand up cool room panels and fit into bottom track
Included
88
Sweeping Floor
Included
89
Test the electrical installation
Included
90
Undertake Clients general all sites induction
Included
91
Using a Harness and Static Line
Included
92
Using an Angle Grinder
Included
93
Using an Existing roof anchorpoint system
Included
94
Vacuum
Included
95
Welding copper tube
Included
96
Welding with a portable Electric Welder
Included
97
Working in isolation
Included
98
Write up incident report
Included