1
Accept load to vehicle from forklift (3rd Party operator) and Loading by hand
Included
2
Acceptance of delivery to site for materials
Included
3
Acceptance of delivery to site for materials via Crane Truck
Included
4
Access roof via Boom Lift
Included
5
Access roof via fixed access ladder
Included
6
Access roof via Ladder
Included
7
Access Roof via scaffold stair access
Included
8
Access roof via Scissor Lift
Included
9
Access work area Using a platform ladder
Included
10
Access work area using a step ladder
Included
11
Access work area via a scaffold/ working at heights from a scaffold
Included
12
Access Work area via scaffold
Included
13
Apply touch up paint
Included
14
Charging of Li-Ion batteries for use with cordless tools
Included
15
Claim Work Area
Included
16
Cleaning up work area
Included
17
Connect hose to existing water supply tap
Included
18
Cut aluminium angles using a hacksaw and mitre box
Included
19
Cut fibre cement sheet using an electric circular fibre cement saw
Included
20
Cut materials using an electric mitre saw
Included
21
Cut plasterboard using a key hole plasterboard saw
Included
22
Cut Steel/ Unistrut with dropsaw
Included
23
Cutting Bitumen with a Quick Cut Diamond blade saw
Included
24
Cutting Concrete with a Quick Cut Diamond blade saw
Included
25
Cutting Steel using an Angle Grinder
Included
26
Drill hole into masonry surface with a battery powered rotary hammer drill
Included
27
Drill hole into masonry surface with an electric rotary hammer drill
Included
28
Drill hole using a Battery Powered Drill
Included
29
Drill hole using an electric drill
Included
30
Erection and use of mobile scaffold
Included
31
Fix aluminium channels to existing slab
Included
32
Fix fibre cement cladding sheet in place and nail by hand
Included
33
Fix fibre cement soffit/ eaves sheet in place and nail by hand
Included
34
Flushing to screws and joints in linings
Included
35
Inform facilities / operations and security personnel of work location(s)
Included
36
Inspect and drive passenger/ light commercial vehicle
Included
37
Inspect and drive passenger/ light commercial vehicle on or off site
Included
38
Inspection and use of Generator
Included
39
Inspection and use of petrol powered high pressure water sprayer
Included
40
Install ceiling registers
Included
41
Install fibre cement linings
Included
42
Install screws using a Battery Powered Drill
Included
43
Install screws using a tek gun
Included
44
Install suspended ceiling grid
Included
45
Installation of Aluminium Doors and Door Hardware
Included
46
Installation of Doors and Door Hardware
Included
47
Installation of insulation Batts to ceiling framing
Included
48
Installation of plasterboard linings
Included
49
Loading Materials onto roof using an EWP
Included
50
Loading materials onto truck using a crane and by hand
Included
51
Manufacture Steel Stud Wall Frames
Included
52
Marking Out Slab or Ground
Included
53
Monitoring and Review of SWMS
Included
54
Move materials using a trolley (sack Truck)
Included
55
Moving materials around on a trolley
Included
56
Passing up Sheets and Accessories from the ground
Included
57
Push Wheel Barrow on site
Included
58
Refuelling of machinery
Included
59
Removal/ demolition of existing suspended exposed grid ceiling
Included
60
Repeat the above process steps until completion of task
Included
61
Safety Check And Use Of Boom Lift
Included
62
Safety Check And Use Of Scissor Lift
Included
63
Safety inspection and use of Forklift
Included
64
Sanding of flushed joints by hand
Included
65
Site Establishment
Included
66
Site orientation of domestic residence
Included
67
Site Orientation/ Induction
Included
68
Sweeping Floor
Included
69
Undertake Clients general all sites induction
Included
70
Unloading of shipping container with forklift and by hand
Included
71
Using a Harness and Static Line
Included
72
Using an Angle Grinder
Included
73
Using an Existing roof anchorpoint system
Included
75
Welding with a portable Electric Welder
Included
76
Working at height from a boom lift
Included
77
Working at height from a scissor lift
Included
78
Working at heights - Genrally
Included
79
Working in hot conditions
Included
80
Working in isolation
Included
81
Write up incident report
Included