1
Accept load to vehicle from forklift (3rd Party operator) and Loading by hand
Included
2
Acceptance of delivery to site for materials
Included
3
Access work area Using a platform ladder
Included
4
Access work area using a step ladder
Included
5
Access work area via a scaffold/ working at heights from a scaffold
Included
6
Access Work area via scaffold
Included
7
Carpet Cleaning
Included
8
Charging of Li-Ion batteries for use with cordless tools
Included
9
Clean bathroom
Included
10
Clean Glass shower screen with a cloth
Included
11
Clean Glass with a cloth
Included
12
Clean mirror with a cloth
Included
13
Clean Window Using Pure Water Technology
Included
14
Clean Windows Using rope Access
Included
15
Clean Windows with mop and squeegee
Included
16
Cleaning of hard surfaces
Included
17
Cleaning of office and showroom
Included
18
Cleaning of residence
Included
19
Cleaning of Rest Rooms / Toilets
Included
20
Connect hose to existing water supply tap
Included
21
Gain acces to work are using Rope Access
Included
22
Inspect and drive passenger/ light commercial vehicle
Included
23
Inspection and use of Carpet Extractor
Included
24
Inspection and use of electric high pressure water sprayer
Included
25
Inspection and use of Generator
Included
26
Inspection and use of High-Speed Propane (LPG) Powered Floor Buffer (Burnisher)
Included
27
Inspection and use of Low-Speed Electric Floor Buffer
Included
28
Inspection and use of petrol powered blower/ vacuum
Included
29
Inspection and use of petrol powered high pressure water sprayer
Included
30
Inspection and use of planetary floor polisher
Included
31
Inspection and use of walk behind battery powered floor scrubber
Included
32
Monitoring and Review of SWMS
Included
33
Mopping Floor
Included
34
Move materials using a trolley (sack Truck)
Included
35
Moving materials around on a trolley
Included
36
Remove bag from bins and waste paper baskets
Included
37
Safety inspection and use of Forklift
Included
38
Site orientation of domestic residence
Included
39
Site Orientation/ Induction
Included
40
Steam cleaning of tiles
Included
41
Sweeping Floor
Included
42
Undertake Clients general all sites induction
Included
43
Unloading of shipping container with forklift and by hand
Included
44
Using a Harness and Static Line
Included
46
Working at height from a boom lift
Included
47
Working at height from a scissor lift
Included
48
Working at heights - Genrally
Included
49
Working in hot conditions
Included
50
Working in isolation
Included
51
Write up incident report
Included