1
Acceptance of delivery to site for materials
Included
2
Acceptance of delivery to site for materials via Crane Truck
Included
3
Access work area Using a platform ladder
Included
4
Arrive at domestic site with truck and establish unloading area
Included
5
Arrive at domestic site with truck and trailer and establish unloading area
Included
6
Claim Work Area
Included
7
Cleaning up work area
Included
8
Coring concrete
Included
9
Create temporary work bench using trestles and planks
Included
10
Cut strapping off around pack of materials
Included
11
Cut timber using a circular saw
Included
12
Cut timber using a jigsaw
Included
13
Cut timber using a reciprocating saw
Included
14
Cut timber using an electric mitre saw
Included
15
Cutting Steel using an Angle Grinder
Included
16
Cutting Steel with an Oxy- Torch
Included
17
Deliver materials to site and unload manually
Included
18
Delivery and installation of temporary fencing
Included
19
Delivery and unloading of mobile plant
Included
20
Erecting, Altering and Dismantling Prefabricated Steel Modular Scaffolding
Included
21
Erection and use of a steel tube scaffold
Included
22
Erection and use of aluminium tube scaffold
Included
23
Erection and use of mobile scaffold
Included
24
Establish a Safe Work Zone-Working on or adjacent road (Traffic Control)
Included
25
Inject Epoxy into holes
Included
26
Inspect and drive passenger/ light commercial vehicle
Included
27
Inspect and drive truck
Included
28
Inspection and use of Generator
Included
29
Install Acro prop
Included
30
Install screws using a Battery Powered Drill
Included
31
Install screws using a tek gun
Included
32
Installation of cantilevered K-Stage Modular Steel Scaffold
Included
33
Installation of Hold Down bolts into existing Concrete
Included
34
Installation of K-Stage Modular Steel Scaffold
Included
35
Installation of simple formwork
Included
36
Lift members into position by hand
Included
37
Marking Out Slab or Ground
Included
38
Monitoring and Review of SWMS
Included
39
Move materials using a trolley (sack Truck)
Included
40
Moving materials around on a trolley
Included
41
Safety inspection and use of Forklift
Included
42
Set up and use laser level
Included
43
Set up trestle scaffold
Included
44
Site Establishment
Included
45
Site orientation of domestic residence
Included
46
Site Orientation/ Induction
Included
48
Tension nuts using a battery powered rattle gun
Included
49
Undertake Clients general all sites induction
Included
50
Unpack fixtures/ materials
Included
51
Working at height from a boom lift
Included
52
Working at height from a scissor lift
Included
53
Working at heights - Genrally
Included
54
Working in hot conditions
Included
55
Working in isolation
Included
56
Write up incident report
Included