Accept load to vehicle from forklift (3rd Party operator) and Loading by hand
Included in v4.5
2
Acceptance of delivery to site for materials
Included in v4.5
3
Acceptance of delivery to site for materials via Crane Truck
Included in v4.5
4
Access roof via Boom Lift
Included in v4.5
5
Access roof via fixed access ladder
Included in v4.5
6
Access roof via Ladder
Included in v4.5
7
Access Roof via scaffold stair access
Included in v4.5
8
Access roof via Scissor Lift
Included in v4.5
9
Access work area using a platform ladder
Included in v4.5
10
Access work area using a step ladder
Included in v4.5
11
Access work area using 'Hop-Up' trestle ladder/ work platform
Included in v4.5
12
Access work area via a mobile scaffold
Included in v4.5
13
Access work area via a scaffold/ working at heights from a scaffold
Included in v4.5
14
Apply touch up paint
Included in v4.5
15
Carrying materials from storage area to work area
Included in v4.5
16
Charging of Li-Ion batteries for use with cordless tools
Included in v4.5
17
Claim Work Area
Included in v4.5
18
Cleaning up work area
Included in v4.5
19
Connect hose to existing water supply tap
Included in v4.5
20
Cut Drywall using a drywall hand saw
Included in v4.5
21
Cut fibre cement sheet using an electric circular fibre cement saw
Included in v4.5
22
Cut hole into existing Drywall surface using a key hole Drywall saw
Included in v4.5
23
Cut materials using an electric mitre saw
Included in v4.5
24
Cut plasterboard using a key hole plasterboard saw
Included in v4.5
25
Cut plasterboard using a plasterboard hand saw
Included in v4.5
26
Cut steel using a battery powered angle grinder
Included in v4.5
27
Cut Steel using an Angle Grinder
Included in v4.5
28
Cut strapping off around pack of materials
Included in v4.5
29
Cutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool
Included in v4.5
30
Drill hole into masonry surface with a battery powered rotary hammer drill
Included in v4.5
31
Drill hole into masonry surface with an electric rotary hammer drill
Included in v4.5
32
Drill hole using a Battery Powered Drill
Included in v4.5
33
Drill hole using an electric drill
Included in v4.5
34
Driving in and out of carparks and on customer premises
Included in v4.5
35
Driving in and out of carparks and on customer premises
Included in v4.5
36
Drywall finishing
Included in v4.5
37
Erection and use of mobile scaffold
Included in v4.5
38
Flushing to screws and joints in linings
Included in v4.5
39
High Risk Construction Work covered in this SWMS
Included in v4.5
40
Inform facilities / operations and security personnel of work location(s)
Included in v4.5
41
Inspect and drive passenger/ light commercial vehicle
Included in v4.5
42
Inspect and drive passenger/ light commercial vehicle on or off site
Included in v4.5
43
Inspection and use of Generator
Included in v4.5
44
Inspection and use of petrol powered high pressure water sprayer
Included in v4.5
45
Install fibre cement linings
Included in v4.5
46
Install fibre cement linings using a battery powered drill
Included in v4.5
47
Install screws using a Battery Powered Drill
Included in v4.5
48
Install screws using a Tek gun
Included in v4.5
49
Install suspended ceiling grid
Included in v4.5
50
Installation of drywall linings
Included in v4.5
51
Installation of insulation Batts to wall and ceiling framing
Included in v4.5
52
Installation of plasterboard linings
Included in v4.5
53
Installing Cement Sheet Cladding
Included in v4.5
54
Listening to music while working
Included in v4.5
55
Loading Materials onto roof using an EWP
Included in v4.5
56
Loading materials onto truck using a crane and by hand
Included in v4.5
57
Manufacture Steel Stud Wall Frames
Included in v4.5
58
Manufacture/ build Steel Stud Wall Frames on site
Included in v4.5
59
Marking Out Slab or Ground
Included in v4.5
60
Monitoring and review of JHA
Included in v4.5
61
Monitoring and Review of SWMS
Included in v4.5
62
Move materials using a trolley (sack Truck)
Included in v4.5
63
Moving materials around on a trolley
Included in v4.5
64
Push Wheel Barrow on site
Included in v4.5
65
Refuelling of machinery
Included in v4.5
66
Safety Check And Use Of Boom Lift (extended version)
Included in v4.5
67
Safety Check And Use Of Scissor Lift (Extended version)
Included in v4.5
68
Safety inspection and use of Forklift
Included in v4.5
69
Sanding of finished drywall by hand
Included in v4.5
70
Sanding of flushed joints by hand
Included in v4.5
71
Sanding of flushed joints using an electric drywall / plasterboard sander
Included in v4.5
72
Site orientation of domestic residence
Included in v4.5
73
Site Orientation/ Induction
Included in v4.5
74
Sweeping Floor or ground
Included in v4.5
75
Undertake Clients general all sites induction
Included in v4.5
76
Unloading of shipping container with forklift and by hand
Included in v4.5
77
Using an Angle Grinder
Included in v4.5
78
Using an Existing roof anchorpoint system
Included in v4.5
79
Vacuum
Included in v4.5
80
Welding with a portable Electric Welder
Included in v4.5
81
Working at height from a boom lift
Included in v4.5
82
Working at height from a scissor lift
Included in v4.5
83
Working at heights - Generally
Included in v4.5
84
Working at heights - Genrally
Included in v4.5
85
Working in an area with the risk of Coronavirus, Covid-19, Influenza or similar
Included in v4.5
86
Working in Cold Conditions
Included in v4.5
87
Working in High Wind Conditions
Included in v4.5
88
Working in hot conditions
Included in v4.5
89
Working in isolation
Included in v4.5
90
Working in the rain
Included in v4.5
91
Working where there is movement of powered mobile plant
Included in v4.5
92
Write up incident report
Included in v4.5