JS Easy...Job Safety...Easy
 
Safe work method Software For All IndustriesJob Safety Analysis - maintain workplace safety with JSA and JSEAsy workplace packagesJSEAsy Premium is your total WHS Management system
Buy JSEAsy Now! From only $160.00 (AUD) you get a 1yr licence for one user. Multiuser and lifetime licences also available.
JSEAsy Overview Video Tour
 

Safe Work Method Statements (SWMS)

 

 

A SWMS is a written document that sets out the high risk work activities to be carried out at a workplace, the hazards and risks arising from these activities and the measures to be put in place to control the risks. Its primary purpose is to help supervisors and workers implement and monitor the control measures established at the workplace to ensure high risk work is carried out safely. 

Download an example of a SWMS generated from the JSEAsy software.

Ensure your SWMS is worth the paper it is written on! A generic one statement catches all document is generally not adequate.

A Safe Work Method Statement (SWMS) Must:

  1. identify the work that is high risk construction work; and
  2. specify hazards relating to the high risk construction work and risks to health and safety associated with those hazards; and
  3. describe the measures to be implemented to control the risks; and
  4. describe how the control measures are to be implemented, monitored and reviewed
  5. be prepared taking into account all relevant matters including
    1. circumstances at the workplace that may affect the way in which the high risk construction work is carried out
    2. if the high risk construction work is carried out in connection with a construction project—the WHS management plan that has been prepared for the workplace; and
    3. be set out and expressed in a way that is readily accessible and understandable to persons who use it


The JSEAsy SWMS Software   enables you to easily and quickly build a site specific SWMS by inserting templates of the steps that you are going to take in the order in which you are going to take them.


A person conducting a business or undertaking that includes the carrying out of high risk construction work must, before high risk construction work commences, ensure that a safe work method statement for the proposed work is prepared or has already been prepared by another person. See Construction SWMS

Hundreds of templates included - 1 low price - Exceptional value!

Don't get sucked in to paying a fee every time you want to create or print a site specific SWMS. With JSEAsy you can create/ print/ save an infinite number of site specific SWMS with the software. No need buy a different SWMS template for every different job task, With JSEAsy they are all included in the software package.

For all of the industries listed below there are hundreds of SWMS Templates are included in the JSEAsy Software .

 

Construction Industry

Air Conditioning and Refrigeration
Bitumen contractors
Brick Layers
Cabinet Makers
Carpentry
Carpet layers
Ceilings and Partitions
Civil Contractors
Cladding Contractors
Cleaners
Commercial Builders
Concreters
Crane Drivers
Data Cabling

 

Dogmen
Domestic Builders
Doors and window fitters
Drain Layers
Earth Moving
Electricians
Excavation
Fencing
Fire Protection
Footing Contractors
Form workers
Foundation Contractors
Glaziers
Gyprockers
Home Improvements
Hydraulic Services
Insulators
Joinery
Landscaping
Mechanical services
Metalwork
Painting and Decorating
Paving
Pest Control
Plumbers
Resilient Finishes
Riggers
Roof Tilers
Roof Plumbers
Scaffolders
Security
Signwriters
Solar Installations
Steel Erectors
Steel Fixers
Steel framers
Steel reinforcing
Structural Steel
Telecommunications
Tilers

Manufacturing

Aerospace manufacturing
Agribusiness
Automotive industry
Biotechnology
Brewing industry
Bus manufacturing
Chemical industry
Clothing industry
Construction
Electronics

 

Emerging technologies
Energy industry
Engineering
Food and Beverage
Food processing
Free machining
Industrial design
Industrial Engineering
Interchangeable parts
Machine tools
Metalcasting
Metalworking
Nanotechnology
Pharmaceutical
Plastics
Process Engineering
Production engineering
Pulp and paper industry
Sailmaker
Semiconductor
Shipbuilding
Steel production
Synthetic biology
Bioengineering
Telecommunications
Tentmaking
Textile manufacturing
Tire manufacturing
Tool and die maker
Transportation

Hospitality

Airline Cabin Staff
Bars
Cafes
Cleaners
Guest Services

 

Hostels
Hotels
Housekeeping
Kitchens
Maintenance
Motels
Nightclubs
Public houses
Reception
Restaurants
Travel agents

Transport

Air
Animal-powered
Boats
Busses
Cargo

 

Cars
Couriers
Ferries
Freight
Human-powered
Passenger
Rail
Road
Ships
Shipping
Taxis
Trucks
Water

Entertainment

Acting
Broadcasting
Comedy
Composers and songwriters
Concert hall
Discotheques
Fashion industry

 

Film
Film production
Film score
Film studios
Live entertainment
Modeling
Movie theaters / cinemas
Music industry
Musical theatre
New media
Orchestras
Performance art
Radio
Reality television
Singers and musicians
Sports
Television
Theme parks

Health Care

Allied Health Professionals
Assisted Living
Caring
Chiropractic

 

Clinic
Dentistry
Healthcare Science
Hospital
Massage
Medicine
Nursing
Nursing Home
Pharmacy
Physio
Teaching Hospital

Mining

Catering
Driller
Electricians
Electronic Engineers
Environmental Science

 

Equipment Operator
Field Assistant
Fitting & Machining
Geological engineering
Geophysicist
Laboratory Assistant
Labourer
Mechanics (Diesel & Plant)
Metal Fabrication
Miner
Rigger
Shotfirer
Surveying
Truck Driver
Desktop View | Tablet View | Mobile View