JS Easy...Job Safety...Easy
 
Safe work method Software For All IndustriesJob Safety Analysis - maintain workplace safety with JSA and JSEAsy workplace packagesJSEAsy Premium is your total WHS Management system
Buy JSEAsy Now! From only $160.00 (AUD) you get a 1yr licence for one user. Multiuser and lifetime licences also available.
JSEAsy Overview Video Tour
 

Structural Steel Job Safety Analysis (JSA)


People often ask, "Can I have a Job Safety Analysis (JSA) for Structural Steel Work?" "A document that covers everything?"  The answer is not really. Well you could create a document that covers most areas of Structural Steel work, but it would be hundreds of pages long and would contain more items that did not apply to your project, than items that did. 

A Job Safety Analysis (JSA) needs to document step by step how you are going to do a particular job. Not all jobs are the same! Are you going to install a ball tube handrail or a multi story structural steel construction?

The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential hazards and the hazard control measures are very different as well.

The JSEAsy software builds your site specific JSA for your structural or metalwork job by adding templates of the steps you are going to take, in the order in which you are going to take them.

The JSEAsy software comes preloaded with hundreds of templates (job steps).

Below is an example of templates you may insert into your site specific JSA for a typical structural project:
  1. Site Orientation/ Induction
  2. Claim work area
  3. Acceptance of delivery to site for materials via Crane Truck
  4. Inspection and use of Generator
  5. Installation of Hold Down bolts into existing Concrete
  6. Safety Check And Use Of Scissor Lift
  7. Safety Check And Use Of Boom Lift
  8. Welding cleats to existing structure with a portable electric welder
  9. Crane Set Up
  10. Land Column  into position with Crane
  11. Tension nuts using a battery powered rattle gun
  12. Land Member into position using crane
  13. Installation of Steel Bracing Members - Using an EWP
  14. Installation of Roof Purlins - Using a Crane
  15. Grout Columns
  16. Cleaning up work area

When you insert a template it automatically brings with it:

  1. The main process step
  2. The sub process steps associated in undertaking the task
    1. The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
    2. The Risk Rating for undertaking the task (You can also change this if you want to)
    3. The Hazard Control measure (you can also delete or add any of these with a simple click)
    4. The revised risk rating after applying the control (You can also change this if you want to)
    5. Any required PPE (you can also delete or add any of these with a simple click)
    6. Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
    7. Any pre operational inspections required (you can also delete or add any of these with a simple click)
    8. Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
Hundreds of templates included - 1 low price - Exceptional value!

When you buy or rent the JSEAsy software, not only to get all of the templates specifically for electrical work but you also get all of the templates for all of the other trades as well. Structural contractors don't just do steel work!  You may benefit from many other industry and trade templates if you are doing a complete job such as: civil works and excavations, concreting, painting etc..

There is an example of a SWMS generated from the system available for download. 

The Main points in this example SWMS are templates that have been inserted into the “Site Specific SWMS” to build it.  

 See JSEAsy features and demonstrations for  video demonstrations on how this works (They run for around 4 minutes each)


 Process: Click the Links below to learn more about JSEAsy Software and the process. Opens in a NEW TAB / WINDOW)

 

View an InfoGraphic about How JSEAsy Software works    

    

View a JSEAsy System Flowchart    

 

When you buy or Rent JSEAsy v4.2 you have access to all of the JSA templates, for all trades and industries.
 
Structural Steel JSATemplates Pre-Loaded and ready for use are shown below:


 

 No.

 Description

 Cost

1 Acceptance of delivery to site for materials Included
2 Acceptance of delivery to site for materials via Crane Truck Included
3 Access roof via fixed access ladder Included
4 Access roof via Ladder Included
5 Access Roof via scaffold stair access Included
6 Access roof via Scissor Lift Included
7 Access work area Using a platform ladder Included
8 Access Work area via scaffold Included
9 Apply touch up paint Included
10 Carrying materials from storage area to work area Included
11 Claim Work Area Included
12 Claim work area on rail line Included
13 Cleaning steel using a power wire brush Included
14 Cleaning up work area Included
15 Concrete filling of Columns Included
16 Connect hose to existing water supply tap Included
17 Coring concrete Included
18 Crane Set Up Included
19 Cut materials using an electric mitre saw Included
20 Cutting Bitumen with a Quick Cut Diamond blade saw Included
21 Cutting Concrete with a Quick Cut Diamond blade saw Included
22 Cutting Steel using an Angle Grinder Included
23 Cutting Steel with an Oxy- Torch Included
24 Drill hole into masonry surface with a battery powered rotary hammer drill Included
25 Drill hole using a Battery Powered Drill Included
26 Drill hole using a magnetic drill Included
27 Drill hole using an electric drill Included
28 Erection and use of mobile scaffold Included
29 Grout Columns Included
30 Inform facilities / operations and security personnel of work location(s) Included
31 Inject Epoxy into holes Included
32 Inspect and drive passenger/ light commercial vehicle Included
33 Inspection and use of Generator Included
34 Inspection and use of petrol powered high pressure water sprayer Included
35 Install screws using a Battery Powered Drill Included
36 Install screws using a tek gun Included
37 Installation of Ball Tube Handrail Included
38 Installation of Chem Anchors onto existing masonry wall Included
39 Installation of Columns - Using a Crane Included
40 Installation of Columns by hand Included
41 Installation of Dynabolts Included
42 Installation of Floor Grating Included
43 Installation of Girts - Using an EWP Included
44 Installation of Hold Down bolts into existing Concrete Included
45 Installation of Roof Purlins - Using a Crane Included
46 Installation of Steel Members - Using an EWP Included
47 Installation of Steel Bracing Members - Using an EWP Included
48 Installation of steel cable Included
49 Installation of Steel Members - Using a Crane Included
50 Installation of Steel members by hand Included
51 Installation of Wall plate by Hand Included
52 Installing Bolts through existing concrete slab Included
53 Land Column into position with Crane Included
54 Land Member into position using crane Included
55 Lift members into position by hand Included
56 Lifting materials using duct lifters Included
57 Lifting members using a chain block Included
58 Loading Materials onto roof using an EWP Included
59 Loading materials onto truck using a crane and by hand Included
60 Marking Out Slab or Ground Included
61 Monitoring and Review of SWMS Included
62 Move materials using a trolley (sack Truck) Included
63 Moving materials around on a trolley Included
64 Push Wheel Barrow on site Included
65 Refuelling of machinery Included
66 Removal of Steel Members by hand using EWP Included
67 Repeat the above process steps until completion of task Included
68 Safety Check And Use Of Boom Lift Included
69 Safety Check And Use Of Scissor Lift Included
70 Safety inspection and use of Forklift Included
71 Site Establishment Included
72 Site orientation of domestic residence Included
73 Site Orientation/ Induction Included
74 Sweeping Floor Included
75 Tension nuts using a battery powered rattle gun Included
76 Undertake Clients general all sites induction Included
77 Using a Harness and Static Line Included
78 Using an Angle Grinder Included
79 Using an Existing roof anchorpoint system Included
80 Vacuum Included
81 Welding cleats to existing structure with a portable electric welder Included
82 Welding with a portable Electric Welder Included
83 Working in isolation Included
84 Write up incident report Included