JS Easy...Job Safety...Easy
 
Safe work method Software For All IndustriesJob Safety Analysis - maintain workplace safety with JSA and JSEAsy workplace packagesJSEAsy Premium is your total WHS Management system
Buy JSEAsy Now! From only $160.00 (AUD) you get a 1yr licence for one user. Multiuser and lifetime licences also available.
JSEAsy Overview Video Tour
 

Structural SWMS

Structural Steel Safe Work Method Statements (SWMS)


People often ask, "Can I have a Safe Work Method Statements (SWMS) for Structural Steel Work?" "A document that covers everything?"  The answer is not really. Well you could create a document that covers most areas of Structural Steel work, but it would be hundreds of pages long and would contain more items that did not apply to your project, than items that did. 

A Safe Work Method Statements (SWMS) needs to document step by step how you are going to do a particular job. Not all jobs are the same! Are you going to install a ball tube handrail or a multi story structural steel construction?

The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential hazards and the hazard control measures are very different as well.

The JSEAsy software builds your site specific SWMS for your structural job by adding templates of the steps you are going to take, in the order in which you are going to take them.

The JSEAsy software comes preloaded with hundreds of templates (job steps) to build your site specific SWMS with. It also includes Safe Operating Procedures (SOP). The JSEAsy Premium software is your total WHS management system.

Below is an example of templates you may insert into your site specific SWMS for a typical structural project:
  1. Site Orientation/ Induction
  2. Claim work area
  3. Acceptance of delivery to site for materials via Crane Truck
  4. Inspection and use of Generator
  5. Installation of Hold Down bolts into existing Concrete
  6. Safety Check And Use Of Scissor Lift
  7. Safety Check And Use Of Boom Lift
  8. Welding cleats to existing structure with a portable electric welder
  9. Crane Set Up
  10. Land Column  into position with Crane
  11. Tension nuts using a battery powered rattle gun
  12. Land Member into position using crane
  13. Installation of Steel Bracing Members - Using an EWP
  14. Installation of Roof Purlins - Using a Crane
  15. Grout Columns
  16. Cleaning up work area

When you insert a template it automatically brings with it:

  1. The main process step
  2. The sub process steps associated in undertaking the task
    1. The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
    2. The Risk Rating for undertaking the task (You can also change this if you want to)
    3. The Hazard Control measure (you can also delete or add any of these with a simple click)
    4. The revised risk rating after applying the control (You can also change this if you want to)
    5. Any required PPE (you can also delete or add any of these with a simple click)
    6. Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
    7. Any pre operational inspections required (you can also delete or add any of these with a simple click)
    8. Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
Hundreds of templates included - 1 low price - Exceptional value!

When you buy or rent the JSEAsy software, not only to get all of the templates specifically for structural work but you also get all of the templates for all of the other trades as well. Structural contractors don't just do steel work!  You may benefit from many other industry and trade templates if you are doing a complete job such as: civil works and excavations, concreting, painting etc..

There is an example of a SWMS generated from the system available for download. 

The Main points in this example SWMS are templates that have been inserted into the “Site Specific SWMS” to build it.  

 See JSEAsy features and demonstrations for  video demonstrations on how this works (They run for around 4 minutes each)


 Process: Click the Links below to learn more about JSEAsy Software and the process. Opens in a NEW TAB / WINDOW)

 

View an InfoGraphic about How JSEAsy Software works    

    

View a JSEAsy System Flowchart    

 

When you buy or Rent JSEAsy v4.2 you have access to all of the SWMS templates, for all trades and industries.
 
Structural Steel SWMS Templates Pre-Loaded and ready for use are shown below:


 

 No.

 Description

 Cost

1
Acceptance of delivery to site for materials
Included
2
Acceptance of delivery to site for materials via Crane Truck
Included
3
Access roof via fixed access ladder
Included
4
Access roof via Ladder
Included
5
Access Roof via scaffold stair access
Included
6
Access roof via Scissor Lift
Included
7
Access work area Using a platform ladder
Included
8
Access Work area via scaffold
Included
9
Apply touch up paint
Included
10
Carrying materials from storage area to work area
Included
11
Claim Work Area
Included
12
Claim work area on rail line
Included
13
Cleaning steel using a power wire brush
Included
14
Cleaning up work area
Included
15
Concrete filling of Columns
Included
16
Connect hose to existing water supply tap
Included
17
Coring concrete
Included
18
Crane Set Up
Included
19
Cut materials using an electric mitre saw
Included
20
Cutting Bitumen with a Quick Cut Diamond blade saw
Included
21
Cutting Concrete with a Quick Cut Diamond blade saw
Included
22
Cutting Steel using an Angle Grinder
Included
23
Cutting Steel with an Oxy- Torch
Included
24
Drill hole into masonry surface with a battery powered rotary hammer drill
Included
25
Drill hole using a Battery Powered Drill
Included
26
Drill hole using a magnetic drill
Included
27
Drill hole using an electric drill
Included
28
Erection and use of mobile scaffold
Included
29
Grout Columns
Included
30
Inform facilities / operations and security personnel of work location(s)
Included
31
Inject Epoxy into holes
Included
32
Inspect and drive passenger/ light commercial vehicle
Included
33
Inspection and use of Generator
Included
34
Inspection and use of petrol powered high pressure water sprayer
Included
35
Install screws using a Battery Powered Drill
Included
36
Install screws using a tek gun
Included
37
Installation of Ball Tube Handrail
Included
38
Installation of Chem Anchors onto existing masonry wall
Included
39
Installation of Columns - Using a Crane
Included
40
Installation of Columns by hand
Included
41
Installation of Dynabolts
Included
42
Installation of Floor Grating
Included
43
Installation of Girts - Using an EWP
Included
44
Installation of Hold Down bolts into existing Concrete
Included
45
Installation of Roof Purlins - Using a Crane
Included
46
Installation of Steel Members - Using an EWP
Included
47
Installation of Steel Bracing Members - Using an EWP
Included
48
Installation of steel cable
Included
49
Installation of Steel Members - Using a Crane
Included
50
Installation of Steel members by hand
Included
51
Installation of Wall plate by Hand
Included
52
Installing Bolts through existing concrete slab
Included
53
Land Column into position with Crane
Included
54
Land Member into position using crane
Included
55
Lift members into position by hand
Included
56
Lifting materials using duct lifters
Included
57
Lifting members using a chain block
Included
58
Loading Materials onto roof using an EWP
Included
59
Loading materials onto truck using a crane and by hand
Included
60
Marking Out Slab or Ground
Included
61
Monitoring and Review of SWMS
Included
62
Move materials using a trolley (sack Truck)
Included
63
Moving materials around on a trolley
Included
64
Push Wheel Barrow on site
Included
65
Refuelling of machinery
Included
66
Removal of Steel Members by hand using EWP
Included
67
Repeat the above process steps until completion of task
Included
68
Safety Check And Use Of Boom Lift
Included
69
Safety Check And Use Of Scissor Lift
Included
70
Safety inspection and use of Forklift
Included
71
Site Establishment
Included
72
Site orientation of domestic residence
Included
73
Site Orientation/ Induction
Included
74
Sweeping Floor
Included
75
Tension nuts using a battery powered rattle gun
Included
76
Undertake Clients general all sites induction
Included
77
Using a Harness and Static Line
Included
78
Using an Angle Grinder
Included
79
Using an Existing roof anchorpoint system
Included
80
Vacuum
Included
81
Welding cleats to existing structure with a portable electric welder
Included
82
Welding with a portable Electric Welder
Included
83
Working in isolation
Included
84
Write up incident report
Included
Desktop View | Tablet View | Mobile View